///Services
4 min read
By Ricardo Kruger
What a full Figma-to-launch Framer project actually includes
"Design and build my site" covers a lot of ground. Here is what is actually inside that scope, so a quote makes sense before you ask for one.

Design plus development sounds like one line item. It is really four phases, each with its own output, and skipping one is usually why a site takes longer than planned or looks different from what was discussed.
The four phases
Research: who the site is for, what competitors look like, what the site has to prove in the first ten seconds.
Visual design: a Figma file with every screen, reviewed and approved before a single layer is built in Framer.
Build: the approved design, rebuilt natively in Framer with real CMS collections, forms and responsive breakpoints, not a static import.
Launch: SEO fields, redirects, analytics, and two weeks of fixes once it is live.
What is usually not included
Brand identity (logo, name, colour system) and copywriting are separate work — they inform the design but are not part of it unless agreed upfront. The Framer site plan and domain are the client's own cost.
How long it actually takes
A project like this runs four to six weeks for a multi-page site with one or two CMS collections. Two design rounds and one build round keep it from dragging into a third or fourth revision.
///Ready to launch?
Design + Web Development
·
$3490*



